The list taken while the final payment is still sitting with you.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society A handover inspection is measured against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, and AS 3000 for the electrical clearances noted.
34 checkpoints across 10 areas on a standard Leppington pre-handover (PCI) inspection. We need the lot accessible and your builder aware an independent inspector is attending. Where a stage is not finished, the report records that rather than passing it.
Recorded at practical completion on Leppington homes.








New Construction Stage Inspections Seven checks through a Leppington build, before each stage is covered.
Building and Pest Inspections Building and timber pest in one attendance, reported separately.
Defect Investigation Reports A single failure, traced back to what was required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 for Leppington's established homes. Instant online pricing for Leppington, or contact the booking team.
Seven, in the roof space of a single Leppington home at practical completion. Insulation is installed from above and the fittings from below, on different days by different trades, and neither sees the other's work. It is the clearest argument we have for going into the roof space at handover.
Where the window meets the Code criteria, yes, and it is a safety item rather than a finish one. We record the window, the measurement and the requirement so it cannot be waved away.
It was undersized for the roof area feeding it. A sump that cannot take the flow backs the gutter up, and in a heavy storm that water goes somewhere other than the downpipe.