Slab pre-pour inspection in Leppington

Cover, steel and formwork, in the hours before any of it turns into concrete.

  • The day before the pour, steel and formwork complete
  • About 1 hour on site
  • Report within 24 hours
Price your Leppington inspectionSend the address and the stage.

Fully licensed & accredited

Stage2 of 7
When to bookThe day before the pour, steel and formwork complete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Leppington slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Leppington builds

The Leppington slab set is smaller than some but it carries the finding that costs the most to miss: a shower recess never formed. That set down has to exist in the slab before the pour, because creating it afterwards means saw cutting a finished structural slab. Alongside it, the ordinary but permanent items: cover below the minimum, mesh sitting against pipework, vapour barrier joints unsealed and waffle pods needing cleaning out.

What we find at this stage in Leppington

  • Shower recess not formed before the pour
  • Concrete cover below the minimum
  • Mesh in contact with or close to pipework
  • Vapour barrier joints not sealed
  • Waffle pods and reinforcement needing cleaning
Further cleaning required before concrete, Leppington
Further cleaning required before concrete
Sample findings

Sample defects found during our slab pre-pour inspections in Leppington

Annotated findings from Slab pre-pour inspections on Leppington builds. Client addresses withheld.

Shower recess not formed, recorded during a slab pre-pour inspection in Leppington
Shower recess not formed
Insufficient concrete cover, recorded during a slab pre-pour inspection in Leppington
Cover short of the minimum
Vapour barrier joints not sealed, recorded during a slab pre-pour inspection in Leppington
Vapour barrier joints unsealed
Cleaning required to waffle pods, recorded during a slab pre-pour inspection in Leppington
Waffle pods needing cleaning

The other stages of a Leppington build

  1. Bored piers inspection in Leppington1Bored piersAfter boring and cage placement, before concrete
  2. Frame inspection in Leppington3FrameOnce frame and trusses are up and the roof is on, before lining
  3. Lock-up (pre-plaster) inspection in Leppington4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Leppington5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Leppington6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Leppington7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Leppington →

Guides

Construction stage guides for Leppington

All guides →

Book a slab pre-pour inspection in Leppington

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Leppington: common questions

Why is a missing recess so serious?

Because the alternative is cutting a set down into a finished structural slab: saw cutting, dust, reinforcement you must not hit, and an engineer's view on what you have just done. Before the pour it costs a piece of formwork.

Is there value in examining a slab once poured?

The surface is all that remains visible. Cover, the steel inside and the barrier beneath it are all beyond reach the moment the concrete is placed.

What if concrete slips a few days?

We shift the booking to suit, at no cost. Programmes move all the time, and that is no basis for dropping the stage.

What is the on site duration?

An hour to ninety minutes on a standard lot, with the report generally out the same evening.

Does cleaning really matter?

Debris between waffle pods and on reinforcement ends up cast into the slab or breaking the bond between steel and concrete. It takes a blower and five minutes beforehand.

What documents should I provide?

Your lot's engineering and the soil report it was based on.