Lock-up inspection in Leppington

Roof on, brickwork up, services in, and the last look before the linings.

  • After roof, cladding and external doors, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Leppington inspectionSend the address and the stage.

Fully licensed & accredited

Stage4 of 7
When to bookAfter roof, cladding and external doors, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Leppington lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Leppington builds

The Leppington lock-up findings run to the envelope and the services together. Weep holes never formed. Ducting resting on the ceiling frame rather than suspended, which crushes the run and kills the airflow the system was designed around. Sarking and wall wrap detail. Stormwater with insufficient cover. Temporary downpipes not installed, so the roof drains onto the ground beside a fresh slab. And the termite management notice missing from the meter box where it should already be.

What we find at this stage in Leppington

  • No weep hole found in a run of brickwork
  • Ducting not suspended, resting on the ceiling frame
  • Sarking and wall wrap detail incomplete
  • Stormwater drainage with insufficient cover
  • Temporary downpipes not installed, termite notice not found
Wall wrap and sarking detail, Leppington
Wall wrap and sarking detail
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Leppington

Annotated findings from Lock-up (pre-plaster) inspections on Leppington builds. Client addresses withheld.

No weep hole found, recorded during a lock-up inspection in Leppington
No weep hole found
Ducts not suspended, recorded during a lock-up inspection in Leppington
Ducting resting rather than suspended
Temporary downpipes not installed, recorded during a lock-up inspection in Leppington
Temporary downpipes not installed
Insufficient cover to stormwater drainage, recorded during a lock-up inspection in Leppington
Stormwater with insufficient cover

The other stages of a Leppington build

  1. Bored piers inspection in Leppington1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Leppington2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Leppington3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Fixing inspection in Leppington5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Leppington6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Leppington7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Leppington →

Guides

Construction stage guides for Leppington

All guides →

Book a lock-up (pre-plaster) inspection in Leppington

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Leppington: common questions

Why must ducting be suspended?

Flexible duct resting on ceiling joists gets crushed and kinked, and a crushed duct moves a fraction of the air it was sized for. The room at the end of it never heats properly and the cause sits above a finished ceiling.

What is a temporary downpipe for?

To take roof water away during construction. Without it, every rain event dumps the whole roof beside your new slab, which is exactly where you least want saturated ground.

Are pre-plaster and lock-up interchangeable terms?

They are. What defines the stage is services in and linings not, which here lasts a few days.

Are the frame items revisited?

Every one, marked fixed, partly fixed or outstanding.

How long should the attendance take?

Roughly two hours on site, plus writing, and more on a bigger or two storey house.

What if the plasterer has started?

We examine what remains open and record the areas already sealed.